Downtown

Manchester’s Premier Residence

with a host of hotel-style services

Starting From

£185K

Estimated Yields

7%

Apartments

368

Bedrooms

1, 2, 3

An energetic community at the gateway to Manchester, providing a spacious range of 368, one, two and three bedroom apartments. Nestled on the banks of the River Irwell, footbridge access provides a direct link to the vibrant centre of Manchester’s booming city within five minutes.

  • 368 luxury apartments
  • 1, 2 & 3 Bedroom
  • SPA – steam room, plunge pools
  • High tech gymnasium
  • Full service concierge
  • Cinema room
  • Business centre
  • 5 minute walk into the city centre
  • 6% rental yields
  • Chill out roof terraces
Development Overview

An energetic community at the gateway to Manchester, providing a spacious range of 368, one, two and three bedroom apartments.

The development will provide the luxury of concierge, a wealth of high grade private realm and communal roof terraces incorporating outdoor kitchens and ‘chill out’ zones. Dried and chilled post rooms ensure you don’t have to be at home to take receipt of goods or perishable food store deliveries as Downtown’s designated concierge will take care of it.

Rapid reactive on site maintenance and coordinated support provides piece of mind for hassle free living and large service lifts ensure moving in is trouble free. Biometric and monitored entry provides a more secure living experience.

Relieve the stresses of a working day in our on site fitness suite, steam room or plunge-pools or relax in our spacious lobby or even enjoy a movie in our state of the art media room.

If working from home is becoming too much, adjourn to our business centre or make use of Downtown’s onsite boardroom and enjoy unrestricted high speed broadband access throughout the property.

Payment Process

Step 1 – Choose an Apartment

Step 2 – Complete Reservation form

Step 3 – £5,000 Reservation fee

Step 4 – 30% on Exchange (Minus £5,000 reservation fee)

Step 5 – 70% on Completion

Construction Updates

The main civil operations up to and including basement car park slab and associated drainage have now been completed, with the concrete Frame commencing within the reporting period.

Phase 1

  • Block D - 3rd floor completed
  • Block E  - 1st floor completed, walls and columns 1st to 2nd floor currently progressing
  • Block F - 1st floor completed, walls and columns 1st to 2nd floor currently progressing 

Phase 2

  • Civil operations to basement completed
  • Basement walls, columns and cores progressing
  • Podium slab progressing
  • The concrete frame operations are currently taking a two week period to commence and complete each floor.

Next update due WC 27th May 2018

 
 