Manhattan Tower
sold out

New York Luxury in Manchester

Newest ultra-premium apartment building

SOLD
OUT

Estimated Yields

6%

Apartments

42

Bedrooms

1 & 2

Welcome to Manhattan, an ultra-premium apartment building and the apple of Manchester’s eye. An exquisite development in the core of the North, Manhattan is situated in the beating heart of the city, just off New York Street on the fringe of Chinatown. Nestle into an ornate haven and wake up in another city that never sleeps…

  • Manchester’s most central location
  • Unrivaled city views of Manchester
  • Exclusive address duplex apartments
  • Five star luxury apartments
  • Full concierge
  • In the heart of the shopping and restaurant district
  • 6% annual rental yields
  • Parking available
Development Overview

A unique concoction of contemporary and industrial architecture, this hybrid development accentuates the stylistic elements of New York elegance with the trademark vibe of bohemian Mancunian lifestyle.

Situated just off New York street on the edge of Chinatown, Manhattan is home to 42 luxury one and two bedroom apartments, each crafted with impeccable design and decorated with intricate details, including floor to ceiling windows and private terrace - an impeccable platform for observing perpetual Mancunian refinement.

Each terrace is set into a lush multi-level green wall, providing an natural wall of privacy to complement the views, more so the 7th floor penthouses which offer views over King Street and across the city.

Payment Process

Step 1 – Choose an Apartment

Step 2 – Complete Reservation form

Step 3 – £5,000 Reservation fee

Step 4 – 30% on Exchange (Minus £5,000 reservation fee)

Step 5 – 70% on Completion

Construction Updates

Update:

  • All demolition & strip out works are now complete
  • Main contractor site set up & welfare is in operation
  • Site security & perimeter hoarding has now been installed
  • Reduced level dig & piling matt to commence end August
  • All CFA piles, attenuation & ground slab will be installed during Sept & October
  • Installation of steel frame will commence end October

Next update due WC 26th November 2018

View Construction Gallery

Location Map

Manhattan Tower

REGISTER INTEREST

Fill in your information to request brochure, prices and availability.

  • This field is for validation purposes and should be left unchanged.