parkgate_logo_landscape

Park Gate

Luxury living in a parkside location

Starting From

£129K

Annual Rental Yields

6%

Apartments

126

Bedrooms

Studio, 1, 2

Featuring 126 luxury studio, one bedroom and two bedroom apartments, Park Gate at Lyndon Place brings together suburban comfort and urban convenience in one of the UK’s fastest growing cities. The development has excellent transport links to Birmingham city centre and is in a prime position to benefit from the new High-Speed Rail Network (HS2).

  • Parkside location
  • Excellent transport links
  • HS2 development nearby
  • Close proximity to the airport, city centre and NEC
  • High rental yields
  • Reception & concierge service
  • Onsite gym
  • Overlooking Sheldon Park
Development Overview

Combining fresh outdoor space, luxury finishes and all of the essentials for modern living, Park Gate perfectly blends suburban life with urban excitement in one of the UK’s fastest growing cities. With each apartment finished to an impeccable standard, residents will have everything they need to relax, unwind and entertain. Park Gate’s location gives the development excellent access to the new high-speed rail network, as well as great transport links into Birmingham city centre and beyond.

Payment Process

Step 1 – Choose an apartment

Step 2 – Complete reservation form

Step 3 – £5,000 reservation fee

Step 4 – 30% on exchange (minus £5,000 reservation fee)

Step 5 – 70% on completion

Construction Updates

September Construction Update 2019

Internally, all demolition works are now completed. The external canopies have all been removed and the process of demolishing the lift overruns to facilitate the new staircases to access the roof garden has begun.

West wing

The show flats on the 4th Floor have been built and the final kitchen installs to the remaining flats are currently underway. On the 3rd floor, kitchen installation is also ongoing as is sanitaryware fitting to finished bathrooms. On the 1st and 2nd floor all partitions have been installed. In addition the raised access floor on the 1st floor has been installed with 1st fix 90% Complete.

East wing

The 2nd floor is now completely stripped out. Whilst on the 4th, 3rd and 1st floors, fix partitioning has been installed with acoustic flooring going in and 1st fix plumbing and electrics ongoing. The 1st floor partitioning to external walls is now 80% complete with raised access flooring starting in October. 90% of all windows are also now in place with the full building now scaffolded to allow new curtain walling to be installed.

 
 
 
Next update due week commencing 16th December 2019
 